Tuesday, December 6, 2011

They're working on the roof!

Workers are starting in on the roof for the addition facing the parking lot.

Hello, up there!

Also, they're building the steel framework for the glass structure over the future lobby.


It's exciting to see things take shape!

Wednesday, November 30, 2011

Taking Shape!

The addition facing our parking lot is starting to look like a building!


Workers are framing out where the windows will be on the first floor.

Wednesday, November 9, 2011

Bricks are picked!

If you have never been involved in the construction of a home, then you would be surprised to know how many variations there are when it comes to bricks and mortar. So many colors! So many textures! Unfortunately for our building, the bricks used 20 years ago are no longer available today. Therefore, we've been on a quest to find a close match for both brick and mortar. If you've been to the library recently, you've probably see a few of our "test walls," short little bits of brick and mortar. The winner is on the left in this photo:


In case you're wondering why there are two different types of brick of these samples, it's because our building has two different styles of brick... the walls of the first floor have a lighter colored brick; the second floor has darker.

In other news, we shot this interesting photo the other day:


Look closely. See the big pile of red dirt? With the worker standing almost up to his waist in a trench? Inside the Library? You must admit, this is something you don't see every day!

Just a quick warning: Soon, the electrical guys will be doing something called "coring" which means they have to drill through the second floor concrete down to the first floor in order to pull cable. It will be noisy. We don't yet have a date, but it will take a day to do the drilling and they will try to give us at least 48 hours advanced notice. This is something that has to be done. Please bear with us... the end results will be worth it!

Monday, October 31, 2011

Moving right along

We now have steel framing up for the front addition! This is where we'll have a 300-seat flat floor auditorium when all is said and done. The new auditorium will be able to be divided into three separate rooms, giving us some much needed additional meeting space! Upstairs will be more room for our ever growing collection:


In other news, check out the progress on the other addition (facing our parking lot):

We have a concrete slab! Work is moving right along.

We snapped a photo this morning from the door into what once (and will be again) our circulation/check out area, and check it out! See that rectangle of gravel? That's where our new elevator will be!

Monday, October 10, 2011

Bye bye, Bricks. Hello, Tunnel!

Workers are now removing bricks from the front of the building to prepare for the addition!



The workers are saving as many bricks as they can for reuse. Also, this "tunnel" may not be very pretty...


... but it was constructed last week to protect everyone from the remote possibility of falling debris as we enter/exit the building.


Thank you for keeping up with our progress by reading our blog!

Monday, September 12, 2011

Men of Steel!

Exciting times at the Library... the workers are installing the steel beams for the addition!




Wednesday, August 31, 2011

On the other side of the wall

If you've been to the Library this week, no doubt you've heard all kinds of hammering and other noises on the second floor. So what's happening on the other side of that wall? The pictures below say it all:


As in, DEMOLITION:


Here's a view through a window into what used to be an office. If you look through the metal studs, you can see the main part of the library's second floor.



Pretty cool, huh?

Some people have been asking us about our beautiful vaulted ceilings on the second floor, as seen below:


Don't worry... they're not going anywhere! The vaulted ceiling is being removed ONLY in the areas that will be under the acoustical ceilings in the new office areas. All of the vaulted ceiling that will be exposed to view when the project is complete will remain as-is.

In other news, get ready to see the framework for the additions popping up outside soon... steel beams have been delivered!